The efficiency of a lift station can be established long before it is a concrete structure containing pumps, piping and valves. Calculations for flow, elevations of the site as well as system pressure, wastewater characteristics, peak conditions maintenance access, controls, and the capacity of the future will all determine what should ultimately be built.
Project owners who want to evaluate the top lift station builders The most important question isn’t just who can design pumps. It is who can translate site conditions and operating demands into a total system that’s practical to build, operate, and maintain.

Image credit: romtecutilities.com
Gravity has Limits
Gravity is usually the simplest way to convey wastewater, however, the terrain and patterns of development don’t always cooperate. The new residential, commercial and industrial sites are often too high or far away from the gravity sewer system.
A lift station will provide the force needed to transport water from one location in the system of collection to another. The design of a lift station requires an understanding of normal operation and less ideal circumstances like a high flow or maintenance of pumps equipment failure or future increases in demands.
Companies that are considered to be among the top wastewater design firms should therefore be able to evaluate the entire problem of conveyance instead of considering the station as a separate part of the equipment.
The existing infrastructure can make the puzzle more difficult
Not only is new construction an obstacle. In addition to maintaining the essential infrastructure for wastewater municipalities often have to upgrade or replace aging stations.
Existing wet wells, force mains, electrical services, controls boundary lines for the site, as well as downstream infrastructure could limit the new design. Engineers will have to determine which elements can remain, what should be upgraded, and which new components are needed.
Romtec Utilities works across municipal commercial, private industrial, retrofit and replacement projects, allowing pumping systems to be built to meet the unique ownership and operating requirements of every project.
Stormwater has different rules
The best stromwater system designers using the supplied search terminology must solve a different hydraulic problem. Stormwater systems may experience drastic variations in their volume, based on rainfall, drainage capacity and the discharge rate allowed.
Stations that are serving detention basins for instance, could need to temporarily store runoff prior to pumping it out at a controlled pace. Engineers need to consider the flow, head conditions, environmental requirements, flood-management objectives and the specifics of the drainage system that is receiving.
Prefabrication can move work away from the jobsite
The difficulty of field assembly may result in problems with scheduling, errors in installation, changes to orders and delays. Romtec Utilities performs significant prefabrication of equipment prior to the construction site is constructed.
Completing more assembly and quality-control tasks in a controlled atmosphere can cut down on the amount of construction needed in the field. According to the project approach presented by Romtec Utilities, certain installations that could otherwise require weeks of work can be reduced to just a few days according to the circumstances of the project.
A commitment to the success of engineering includes the commissioning process.
It’s not enough just to put in all the parts for a station to be considered a reliable one. Romtec Utilities provides installation advisors and monitors the construction process with start-up, control-panel checks pumps, pump operation, system testing, and training for personnel. The documentation also provides operators with information they can reference when maintaining the system or evaluating future expansion.
People who want to find the most skilled designers for lift stations must pay attention to this stage. The result of good engineering must be more than a set acceptable sketches. The proprietor should be left with a functional system and well-trained staff, as well as helpful documentation, and equipment that is made to be able to handle the daily operating conditions of the station.